Roads & Highways Ongoing 2026

DEWA rfx_2122500177 – Reinstatement of Tiles & Asphalt

Dubai Electricity & Water Authority (DEWA) Dubai, UAE 2026
Overview

Ongoing reinstatement of interlock tiles and asphalt surfaces following DEWA network works at multiple locations across Dubai.

Under DEWA contract rfx_2122500177, Tanveer Ahmed Road Contracting LLC (TARC) is reinstating interlock tiles and asphalt surfaces disturbed by utility network works at multiple locations across Dubai. The scope covers trench reinstatement, asphalt patching, tile replacement, and kerb repairs.

Works are executed on a call-off basis with rapid mobilisation, restoring roads, footpaths, and paved areas to DEWA and municipal standards with minimal disruption to residents and traffic.

Scope of work

  • Asphalt reinstatement works
  • Interlock tile reinstatement
  • Trench backfill and compaction
  • Kerb repairs and replacement
  • Pavement markings restoration
  • Traffic management during works
  • Quality testing and documentation
Multiple
Locations Across Dubai
2026
Currently in Progress
100%
Reinstatement Standard Compliance
Zero
Safety Incidents
How it ran

Project timeline

Phase 01

Contract Mobilisation

Teams, equipment, and material supply chains have been mobilised for call-off reinstatement works.

Phase 02

Site Reinstatements

Asphalt and tile reinstatement works are progressing across issued locations.

Phase 03

Inspections & Snagging

Completed sites are inspected, tested, and closed out with DEWA representatives.

Phase 04

Contract Completion

Final documentation and handover follow completion of all issued work orders.