Roads & Highways Ongoing 2026

Repairing of Access Roads and Tower Platforms in 400KV OHL

Dubai Electricity & Water Authority (DEWA) Dubai, UAE 2026
Overview

Repair of access roads and tower platforms along 400kV overhead line corridors — keeping critical transmission infrastructure accessible year-round.

Tanveer Ahmed Road Contracting LLC (TARC) is repairing access roads and tower platforms along 400kV overhead transmission line corridors. The works include road base repairs, regrading, platform reinstatement, and drainage improvements to maintain safe, all-weather access for maintenance crews.

Working near live transmission infrastructure requires strict permit-to-work compliance, safety clearances, and close coordination with the network operator throughout execution.

Scope of work

  • Access road repairs and regrading
  • Road base reinstatement and compaction
  • Tower platform repairs
  • Drainage and erosion control
  • Safety clearances and permit compliance
  • Dust control measures
  • Progressive inspections
40+ km
Corridor Access Under Repair
2026
Currently in Progress
100%
Permit-to-Work Compliance
Zero
Safety Incidents
How it ran

Project timeline

Phase 01

Corridor Survey & Planning

Condition surveys and prioritised repair planning have been completed along the corridors.

Phase 02

Access Road Repairs

Road repairs and regrading are progressing tower to tower.

Phase 03

Platform & Drainage Works

Tower platform reinstatement and drainage improvements follow the road repairs.

Phase 04

Verification & Handover

Joint inspections with the operator close out each completed corridor section.