Entry and exit road infrastructure for ENOC Filling Station Plot TP-229 in Dubai South, Jebel Ali — safe, efficient vehicle access and smooth traffic circulation.
Tanveer Ahmed Road Contracting LLC (TARC) successfully completed the construction of the entry and exit road infrastructure for ENOC Filling Station Plot TP-229 in Dubai South, Jebel Ali. The project was designed to provide safe and efficient vehicle access while ensuring smooth traffic circulation for one of the region’s leading fuel retail networks.
The works included road construction, asphalt paving, grading, drainage coordination, and associated civil infrastructure. Delivered with a strong focus on quality, safety, and operational efficiency, the project supports seamless vehicle movement while meeting ENOC’s engineering standards and project requirements.
Construction planning, engineering coordination, and site mobilisation were completed to prepare for efficient execution while maintaining operational safety.
Excavation, grading, compaction, and road base installation were completed to establish a durable pavement foundation.
Asphalt paving, kerbstone installation, drainage coordination, pavement markings, and traffic management infrastructure were completed in accordance with project specifications.
Comprehensive inspections, pavement testing, and final client approvals were successfully completed before project handover.
Get a detailed, no-obligation estimate from our engineering team.