Roads & Highways Ongoing 2026

Construction of Interlock Parking in 7 Different Locations at Dubai – Cont# 12502009

Dubai Municipality Dubai, UAE 2026
Overview

Construction of interlock parking areas at 7 locations across Dubai under contract 12502009 — currently in progress.

Under contract 12502009, Tanveer Ahmed Road Contracting LLC (TARC) is constructing interlock parking areas at seven locations across Dubai. The works cover excavation, base preparation, interlock block paving, kerbing, and markings at each site.

The multi-site programme is sequenced to run several locations in parallel, with consistent quality control and traffic management applied across all sites.

Scope of work

  • Excavation and base preparation
  • Sub-base laying and compaction
  • Interlock block paving
  • Kerbstone installation
  • Bay markings and signage
  • Traffic management per site
  • Site-by-site inspections and handover
7
Locations Across Dubai
2026
Currently in Progress
25,000 m²
Interlock Paving Planned
Zero
Safety Incidents
How it ran

Project timeline

Phase 01

Multi-Site Mobilisation

Surveys, approvals, and mobilisation have been completed across the seven locations.

Phase 02

Base Works

Excavation and base preparation are progressing at multiple sites in parallel.

Phase 03

Interlock Paving

Block paving, kerbing, and markings follow the completed base works at each site.

Phase 04

Site Handovers

Each location is inspected and handed over progressively until contract completion.