← All projects
Civil Infrastructure Ongoing 2026

Supply and Install of Car Parking Shades at DEWA R&D Centre Solar Park

Dubai Electricity & Water Authority (DEWA) MBR Solar Park, Dubai, UAE 2026
Overview

Supply and installation of car parking shade structures at the DEWA R&D Centre within the MBR Solar Park — currently in progress.

Tanveer Ahmed Road Contracting LLC (TARC) is supplying and installing car parking shade structures at the DEWA Research & Development Centre within the Mohammed Bin Rashid Al Maktoum Solar Park. The works include foundations, structural steel shade frames, fabric installation, and associated finishing works.

Executing within a secure, operational research facility requires disciplined access control, phased installation, and close coordination with facility management to avoid disruption to daily operations.

Scope of work

  • Shade structure foundations
  • Structural steel supply and erection
  • Shade fabric installation
  • Paving reinstatement around bases
  • Bay markings reinstatement
  • Access coordination within secure facility
  • Final inspection and handover
100+
Parking Bays To Be Shaded
2026
Currently in Progress
100%
Facility Operations Maintained
Zero
Safety Incidents
How it ran

Project timeline

Phase 01

Design Approval & Procurement

Shade structure designs have been approved and materials procured.

Phase 02

Foundations

Foundation works are progressing bay group by bay group.

Phase 03

Steel & Fabric Installation

Frame erection and fabric installation follow the completed foundations.

Phase 04

Reinstatement & Handover

Paving reinstatement, markings, and final handover are scheduled upon completion.